Diluted with water - we recommend pouring SILRES® BS SMK 550 into water - SILRES® BS SMK 550 is injected under the effects of pressure via drilled holes to combat rising damp in masonry. The aim is to completely saturate the masonry in the injection zone. Pressure injection is usually preferred for high levels of damp.
Processing
The ready-to-use dilution of SILRES® BS SMK 550 is injected into the stone / brickwork via holes. The holes are usually drilled at ground level (outside) or at floor level (inside). The distance between them depends on the absorbency of the construction material. 10 to 12 cm is usually sufficient for homogeneous masonry.
All holes should be approx. 5 cm shorter than the thickness of the masonry and they must be cleaned of dust before injection.
Pressure injection is the best method of treating high levels of rising damp. Packers are inserted into the holes and the silicone microemulsion is forced through at a pressure of preferably 2 - 5 bar. Cavities in inhomogeneous masonry should be filled with a cement slurry before.
Very high levels of damp may be treated by activating the silicone microemulsion with blends of alkaline products or pure siliconates after 1 - 2 days. The active agents (alkylsilicates) are deposited immediately and the result is faster, better build-up of the horizontal damp course.
The masonry in the injection zone must be completely saturated with the microemulsion in order for the damp course to be fully functional. This is achieved by allowing sufficient time for injection (5 to 10 minutes for pressure injection).
For injection, we recommend diluting SILRES® BS SMK 550 with drinking water in the ratio of 1 : 9. Only as much of the product as can be used on the same day should be prepared.